Quality control and on-time delivery
How an order is planned and controlled between drawing review and dispatch, and why that keeps supply steady.
Quality is planned into the order, not inspected in at the end
Tap or hover a card to see what happens at each stage.
Inspection scope, sampling and documentation are agreed with each customer. This site does not publish certification, tolerance or customer-name claims; please ask us directly for the records you need.
Why capacity and proximity protect your schedule
Late deliveries usually trace back to a bottleneck: a single press, a tool waiting on an outside vendor, or a finishing lot that was never scheduled. Our set-up is arranged to avoid each of these.
- Several units. Work can be balanced across our three manufacturing units in Ambad and Satpur.
- Many press sizes. A part can run on the press that fits it, and a second press can cover if one is busy.
- Tooling in-house. New tools and adjustments are not queued behind other companies' jobs.
- Finishing scheduled early. Coating and galvanizing slots are planned together with production.
See the press shop and the tool room for the equipment behind this.
What to include with a repeat-order enquiry
- Expected monthly or annual quantity and call-off pattern
- Packing method and labelling expected at your end
- Inspection or documentation requirements
- Delivery location and preferred schedule
Common questions
Not sure about thickness limits, tonnage or file formats? The FAQ covers them, and the contact page takes your drawing directly.
Want a schedule you can plan around?
Share quantities and delivery expectations with your drawing.